Project Details:
Program:
Year: 2018
Area:

Text provided by the architects

It always takes time to make something great, but what surprised T2.a architects about its Jazz Loft project was how a forced break unexpectedly managed to lead to a more refined and rewarding building in the long run. Renovated from an abandoned 19th Century mill, architects Bence and Gabor Turanyi were first tasked with the delicate refurbishment work back in 2005. One economic crash and a change in vendor later has lead to a project that has evolved through a number of growing pains before finally becoming the structure that it is today 15 years later. Jazz Loft proves that a solid plan, the architect’s vision and great determination aren’t the only requirements for a great building; sometimes the building itself will have a life of its own.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

When the project first began, the conservation of the old industrial property - which was used as a mill and constructed in the 1860s - was of the utmost priority. This was on top of a new apartment complex that was to be built as part of the neighbourhood’s development, requiring the two buildings - old and new - to share a harmonious aesthetic as well as a communal garden. But it was the industrial look of the old mill’s structure that was compelling to Bence Turanyi. The red brick exterior was restored, which was then reinforced with concrete to maintain the integrity of the building, while also pairing a modern industrial look alongside the more traditional.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

However, the financial crisis struck in the late 2000s, running the project further and further away from T2.a’s original intention of high quality and ultimately leading the client to abandon the project altogether. Despite its refurbished shell, a half-finished concrete attachment built on its top lacking the bold steel rooftop, the old mill laid dormant once again - this time for almost a decade, until which point a new client came on board.

The new owner understood the values of the building and its potential,” Bence explains of this milestone for the property, highlighting the importance that high quality architectural and technical restoration held for the project from the start. “We restarted the project at the last moment; it was a question at the beginning if we could even still use the structure because it was so wet and full of salt. The main task was to prove this and to find a way to keep it as it is.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

In this way T2.a could ensure that not only the building’s original heritage could live on, but the story of its tumultuous rebirth, too. The attached concrete structure inspired Bence Turanyi in its simple, naked elegance, and this led to a new approach towards the mill. With this separation of time, the building’s regeneration was more homogenous with its origins, blending the brick facade with a careful and elegant roof created from an asymmetrical line. With the purple clinker brick and large double glazed windows that the added top floor is built from, there’s an immediate contrast that gives the industrial building a modern appeal.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

While the outward facing walls maintain a stoic sense of its history from the road it runs beside, the inward facing walls - which overlook onto a gardened area for the building’s inhabitants - have a much more playful appearance to them. This is how the original mill building and its modern apartment block opposite were able to blend together more seamlessly, thanks in large part to the brightly coloured balconies that add character to the whole structure and refer back to the look of the apartments. This is true of the interiors, too, most notable in the staircases that combine stark unpainted concrete with the exposed brick of the building. It’s these staircases that give the building its name, too, which are named after famous jazz musicians.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

This modernity was prevalent from the client’s desire to create a smart structure, too, a high-quality, sustainable building that is a world away from the post-Industrial Revolution building that formed the basis of the property and the socialist building blocks so common in this part of the city. Inhabitants can control many of the functions of their homes - such as the heating, lighting or window shades - while the building itself has cutting edge smart technology implemented into it. Key among them is the heat pump system, which is based on renewable energy and can be operated to react to the time of day, outdoor temperature and even orientation of the apartment.

Forced pause: restoration of a 19th century mill
Photograph © Zsolt Batár

For T2.a, the Jazz Loft project has been a long process, but one whose extended time ultimately led to a better, more refined building in the end. “As an architect, it is painful to see the decomposition of a house half finished,” says Bence Turanyi. “But when we restarted the project, I suddenly saw the beauty in its rusted and decaying concrete torso that we had built on top of the mill a decade earlier, that even inspired us to create a series of photos of the beauty of the architectural structure in this condition. It was a moment of inspiration that ultimately led to what Jazz Loft is today.

Project Credits:
1st phase (2006–2009)
Architect: Gábor Turányi and Bence Turányi (T2a Architects)
Project architect: Levente Skultéti
Contributing architects: Péter Márk, Marcell Lévai, Éva Pinczés, Dénes Regõczi

2nd phase (2016–2018)
Architect: Bence Turányi (T2a Architects)
Project architects: Renáta Gyurcsó, Gábor Balla
Contributing architects: Bálint Laczkó-Petõ, Dénes Regõczi, Fruzsina Újfalussy, Tamás Fülöp, Péter Oravecz
Interior design of the communal areas: István Ölbey (HOME.HU)
Developer: Merkapt Zrt

Read more:
Subscription Form (#2)

0 0 votes
Article Rating
2 Comments
Newest
Oldest Most Voted
Inline Feedbacks
View all comments
trackback

[…] sizes, topped by spectacular penthouses on the top. Designed from the inside-out, there are eight apartments on a typical floor: four two-bedroom apartments that occupy the main corners of the plan, and four […]

trackback

[…] of a transformative, $60 million capital campaign in support of this multi-phase expansion and renovation project. The first phase will renovate and revitalize the existing structure, which includes a […]

magnifiercross
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram